Tuesday 26 October 2010

The Suzuki Gn250 project

In April I got my hands on a very old Suzuki Gn250 for very little money off a work colleague. The initial idea was to rebuild the bike to standard with new parts replacing the rusted/broken/generally knackered bits.
 Above is how she looked after a clean and wipe down. With a close look, I was quite pleased. the bike was bought initially by Gemma for £50 from a colleague (long story) and was then given to me as a swap for a kitten so i am sure you can imagine my anxiety at the state of it. After a close look, i was pleased to find that it was in relatively good nick.
Rotten/rusted parts:
Exhaust system (absolutely knackered)
Mud guards (rotten through)
Frame (looks like battery has leaked, acid causing cack on the frame)
Handlebars (surface rust and gunk)
Accessories, such as footrests, horn mount, stands, back box frame (which was definately getting slung anyway), indicator stalks, brackets etc
Light rust/ Surface gunk on wheels, headlight




 The more parts that came off, the more rusty/horrible parts i found!

 An ever growing pile of bits.

 See previous comment! frame at powder coaters at this point, wheels done.

 The frame was stripped, and sent to a friends for sand blasting and powder coating. After a little fettling with scrapers and knives it fit together quite nicely!

 Wheels cleaned up using rubbing compound, t-cut and wd-40.

As with most things I start i changed my mind almost immediately when it came to putting it together.


 Some of the smaller parts carefully dumped into a box.... this laissez-faire attitude would come back to bite me.

 The engine, i decided, would look better painted black with the cooling fins sanded/polished.

 The bike with a few of the cleaned up/replaced accessories. This was disappointingly simple. Once the engine was in place, it took less than two hours to fix most of the bits in place. The wiring loom was positioned roughly in situ (cue karmic reprimand for attitude). You should be able to see the new clip-on handlebars fitted, cleaned up brake drum, polished frame/wheels and painted engine.

The (very slowly) decreasing pile of parts. VFR looking neglected with shelving leaning up on the wall, bits and pieces scattered on the floor. Excuse the mess. just before the beginning of the project all my shelves in the garage fell down, luckily my bike was out at the time. As you can see, the bike is competing for spare time with shelves that need putting up!

While all the chucking back together was going on, the tank and side panels were sent to another friends spray shop, where they were painted up. no picture as of yet, but one should be coming over the next week or so (probably longer...)

It is currently at my father's garage, awaiting a new battery, chain and exhaust, then the electrics can have a shake down, make sure it's all working.... then the big one: see if it still runs. it did when i took it to bits, so if it doesn't now, there's only one person to blame! fingers crossed. will update blog when progress is made. don't hold your breath!

Update:

I've been to my father's and done some more fiddling, no chain/battery/etc but bits and bobs of fastening and general cleaning up.

The bike looking rather meek and worthless among dads toys! maybe pictures of them in another post sometime.

No comments:

Post a Comment